Sailing Squibvideo

Squib's Refit - Status update end of July 2024 /79

August 8, 2024 · 21 min · 1K views · Vienna

What this video covers

The refit of the boat Squib remains ongoing, forcing the crew to postpone their planned departure from Vienna until May 2025.0:19 A mid-July assessment revealed the vessel remains a major construction site, with significant interior and exterior work still required before it is seaworthy.0:25 Key outstanding tasks include servicing the port engine, grinding and painting the engine bilge, installing the windlass pedestal, and completing the electrical system, which currently lacks a residual current device, circuit breakers, and proper grounding.3:08 The galley remains in a raw state, the head requires a new toilet and holding tank installation, and the cabin sole and ceiling panels are incomplete.6:25 Externally, the cockpit requires painting, the application of KiwiGrip non-skid coating, and the installation of the bow pulpit and stanchions.9:07 The crew also plans to assemble a new Selden furling system for the mast and replace the wiring.19:07 Postponing the departure allows the crew to complete these critical systems properly rather than attempting an unsafe, rushed launch.12:19

Watch on YouTube

More from Sailing Squib

Sailing Squib - May 2026/3Sep 2026Sailing Squib May 2026 /2Aug 2026Sailing Squib - Contemporary WitnessJul 2026Sailing Squib - May 2026 /1Jul 2026

From Sailing Squib — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue