Sailing Squibvidéo
Squib's Refit - Status update end of July 2024 /79
8 août 2024 · 21 min · 1K vues · Vienna
Ce que couvre cette vidéo
The refit of the boat Squib remains ongoing, forcing the crew to postpone their planned departure from Vienna until May 2025.0:19 A mid-July assessment revealed the vessel remains a major construction site, with significant interior and exterior work still required before it is seaworthy.0:25 Key outstanding tasks include servicing the port engine, grinding and painting the engine bilge, installing the windlass pedestal, and completing the electrical system, which currently lacks a residual current device, circuit breakers, and proper grounding.3:08 The galley remains in a raw state, the head requires a new toilet and holding tank installation, and the cabin sole and ceiling panels are incomplete.6:25 Externally, the cockpit requires painting, the application of KiwiGrip non-skid coating, and the installation of the bow pulpit and stanchions.9:07 The crew also plans to assemble a new Selden furling system for the mast and replace the wiring.19:07 Postponing the departure allows the crew to complete these critical systems properly rather than attempting an unsafe, rushed launch.12:19
Plus de vidéos de Sailing Squib
De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



