Sven Yrvindvideo
10 Aug 2025 2 latch reinforcements, port side
August 9, 2025 · 4 min · 2K views
What this video covers
Sven Yrvind reinforces the hatch latches on his boat by laminating two new structural supports on the port side.▶ 3:23 The process requires flipping the vessel to an even keel to ensure proper alignment and clearance for the gimbal mechanism.▶ 1:15 After applying epoxy, he installs four cleats and two handholds to secure the hatch downhaul lines.▶ 2:32 The design provides sufficient clearance for the gimbal, which sits far to the side of the hatch assembly.▶ 3:43 To maintain precision during the build, he rotates the boat between an inverted position for lamination and an upright position for layout and drawing.▶ 1:12 The reinforcement work confirms that the hardware placement does not interfere with the internal gimbal movement.▶ 1:41
More from Sven Yrvind
From Sven Yrvind — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



