Sven Yrvindvidéo
10 Aug 2025 2 latch reinforcements, port side
9 août 2025 · 4 min · 2K vues
Ce que couvre cette vidéo
Sven Yrvind reinforces the hatch latches on his boat by laminating two new structural supports on the port side.▶ 3:23 The process requires flipping the vessel to an even keel to ensure proper alignment and clearance for the gimbal mechanism.▶ 1:15 After applying epoxy, he installs four cleats and two handholds to secure the hatch downhaul lines.▶ 2:32 The design provides sufficient clearance for the gimbal, which sits far to the side of the hatch assembly.▶ 3:43 To maintain precision during the build, he rotates the boat between an inverted position for lamination and an upright position for layout and drawing.▶ 1:12 The reinforcement work confirms that the hardware placement does not interfere with the internal gimbal movement.▶ 1:41
Plus de vidéos de Sven Yrvind
De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



