Acorn To Arabellavideo

Working Towards the Galley & Alix Update - Episode 183 - Acorn to Arabella: Journey of a Wooden Boat

October 8, 2021 · 26 min · 127K views · Massachusetts

What this video covers

Steve continues interior construction on the wooden boat *Arabella*, focusing on the aft bulkhead, head layout, and galley counter.0:03 He mocks up the head area using cardboard to ensure adequate knee room and space for a portable, foot-pump-pressurized shower.4:38 To improve draft, he plans a straight chimney run for the wood stove, positioning the stove doors fore-and-aft to prevent accidental opening while the boat heels.14:29

For the galley counter, Steve and his team perform a large-scale glue-up of wooden blocks using a two-part epoxy process.17:57 They apply a thin coat for initial adhesion followed by a thickened mixture of epoxy and sawdust to fill gaps and shakes.18:37 Because the epoxy’s working time is limited to 45 minutes, they complete the glue-up in three separate installments rather than one.20:54 The project also involves installing a stainless steel surround near the wood stove to contain potential hot ash spills.13:49

Watch on YouTube

More from Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... AgainOct 2026Saying Goodbye to Newfoundland—and the Man Who Inspired ArabellaSep 2026Upgrading the Rudder and Another Trek To The CliffAug 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South CoastJul 2026

From Acorn To Arabella — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue