Acorn To Arabellavídeo

Working Towards the Galley & Alix Update - Episode 183 - Acorn to Arabella: Journey of a Wooden Boat

8 de outubro de 2021 · 26 min · 127K visualizações · Massachusetts

O que este vídeo aborda

Steve continues interior construction on the wooden boat *Arabella*, focusing on the aft bulkhead, head layout, and galley counter.0:03 He mocks up the head area using cardboard to ensure adequate knee room and space for a portable, foot-pump-pressurized shower.4:38 To improve draft, he plans a straight chimney run for the wood stove, positioning the stove doors fore-and-aft to prevent accidental opening while the boat heels.14:29

For the galley counter, Steve and his team perform a large-scale glue-up of wooden blocks using a two-part epoxy process.17:57 They apply a thin coat for initial adhesion followed by a thickened mixture of epoxy and sawdust to fill gaps and shakes.18:37 Because the epoxy’s working time is limited to 45 minutes, they complete the glue-up in three separate installments rather than one.20:54 The project also involves installing a stainless steel surround near the wood stove to contain potential hot ash spills.13:49

Assistir no YouTube

Mais de Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againout. de 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellaset. de 2026Upgrading the Rudder and Another Trek To The Cliffago. de 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjul. de 2026

De Acorn To Arabella — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema