RAN Sailingvideo

More Bulkheads & New Compartment Taking Shape - Ep. 427 RAN Sailing

January 31, 2025 · 21 min · 114K views · Skåne

What this video covers

Johan and Malin continue the interior build-out of their boat, focusing on the head and shower compartment.0:47 To accommodate the 1.7-meter width of the shower bulkheads, Johan cuts the panels in two sections and joins them with epoxy, noting that the foam core acts as a spacer and the bond strength between pieces does not compromise the structural integrity of the fiberglass laminate.1:51 He uses a vacuum bagging technique to laminate the panels, experimenting with pre-bending the foam over the mold using thickened epoxy before applying fiberglass to ensure a precise fit.7:55 To prevent deformation during the vacuum process, he leaves a section of material in the center of the bulkhead cutouts, removing it only after lamination.14:04 The layout includes a dedicated space for the holding tank, a sink, and storage lockers, with bulkheads positioned to manage shroud loads from the chain plates.4:14 The project concludes with tabbing the bulkheads to the hull using triangular foam fillets to bridge the varying hull angles.17:46

Watch on YouTube

More from RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502Sep 2026This Is Where Boat Builds Break People - Ep. 501 Ran SailingAug 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran SailingAug 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran SailingAug 2026

From RAN Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue