RAN Sailingvideo
More Bulkheads & New Compartment Taking Shape - Ep. 427 RAN Sailing
31 January 2025 · 21 min · 114K views · Skåne
What this video covers
Johan and Malin continue the interior build-out of their boat, focusing on the head and shower compartment.0:47 To accommodate the 1.7-meter width of the shower bulkheads, Johan cuts the panels in two sections and joins them with epoxy, noting that the foam core acts as a spacer and the bond strength between pieces does not compromise the structural integrity of the fiberglass laminate.1:51 He uses a vacuum bagging technique to laminate the panels, experimenting with pre-bending the foam over the mold using thickened epoxy before applying fiberglass to ensure a precise fit.7:55 To prevent deformation during the vacuum process, he leaves a section of material in the center of the bulkhead cutouts, removing it only after lamination.14:04 The layout includes a dedicated space for the holding tank, a sink, and storage lockers, with bulkheads positioned to manage shroud loads from the chain plates.4:14 The project concludes with tabbing the bulkheads to the hull using triangular foam fillets to bridge the varying hull angles.17:46
More from RAN Sailing
From RAN Sailing — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



