RAN Sailingvidéo

More Bulkheads & New Compartment Taking Shape - Ep. 427 RAN Sailing

31 janvier 2025 · 21 min · 114K vues · Skåne

Ce que couvre cette vidéo

Johan and Malin continue the interior build-out of their boat, focusing on the head and shower compartment.0:47 To accommodate the 1.7-meter width of the shower bulkheads, Johan cuts the panels in two sections and joins them with epoxy, noting that the foam core acts as a spacer and the bond strength between pieces does not compromise the structural integrity of the fiberglass laminate.1:51 He uses a vacuum bagging technique to laminate the panels, experimenting with pre-bending the foam over the mold using thickened epoxy before applying fiberglass to ensure a precise fit.7:55 To prevent deformation during the vacuum process, he leaves a section of material in the center of the bulkhead cutouts, removing it only after lamination.14:04 The layout includes a dedicated space for the holding tank, a sink, and storage lockers, with bulkheads positioned to manage shroud loads from the chain plates.4:14 The project concludes with tabbing the bulkheads to the hull using triangular foam fillets to bridge the varying hull angles.17:46

Regarder sur YouTube

Plus de vidéos de RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502sept. 2026This Is Where Boat Builds Break People - Ep. 501 Ran Sailingaoût 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailingaoût 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailingaoût 2026

De RAN Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème