RAN Sailingvideo

Work Work Work - Ep.18 RAN Sailing

July 4, 2016 · 13 min · 90K views · Las Palmas, Gran Canaria

What this video covers

Johan and Malin upgrade the ground tackle on their 10-ton displacement boat in Las Palmas, Gran Canaria, by replacing a 15-kg Bruce anchor with a 25-kg Rocna.2:02 Because the new anchor does not fit the existing bow roller, they design and fabricate a custom stainless steel roller assembly with the help of a local welder.2:07 The crew also relocates their navigation instruments and chart plotter from the aft cockpit to a new custom-built plywood pod mounted under the spray hood to improve visibility while sailing.4:17 They construct the pod by boiling plywood to achieve a tight radius, sealing the wood with epoxy, and laminating the former instrument mounting holes on the cockpit bulkhead.4:59 After completing the refit, they sail down the east coast of Gran Canaria in 25 to 30 knots of wind using only the headsail.11:04 Oversizing an anchor requires modifying the bow roller geometry to ensure proper fit and deployment.

Watch on YouTube

More from RAN Sailing

Will the Sanding EVER End? Building Our Dreamboat - Ep. 503 Ran SailingSep 2026Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502Sep 2026This Is Where Boat Builds Break People - Ep. 501 Ran SailingAug 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran SailingAug 2026

From RAN Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue