RAN Sailingvideo
The Hardest Part Of Building A Boat - Ep. 495 Ran Sailing
July 17, 2026 · 23 min · 92K views · Skåne
What this video covers
Construction of a 52-foot custom sailboat continues with the lamination of the port and starboard toe rails using fiberglass and vacuum bagging.▶ 0:53 The process involves saturating two layers of fiberglass on a table, rolling them onto the rail, and curing them under vacuum.▶ 1:38 Following the lamination, the project shifts to fairing and sanding the hull to achieve a uniform, professional finish.▶ 8:47 To bridge high and low spots, long boards—including 1200mm and 1400mm flexible sanding blocks from Flexi Sander—are used rather than orbital sanders.▶ 12:47 A guide coat of black powder reveals low spots during the sanding process, which are then filled with epoxy filler.▶ 18:54 The team notes that working in summer temperatures accelerates epoxy curing, preventing the sanding paper from gumming up.▶ 22:22 Achieving a fair hull requires multiple rounds of filling and sanding, with the goal of creating a continuous, smooth curve rather than a perfectly polished surface at this stage.▶ 11:15
More from RAN Sailing
From RAN Sailing — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



