Wildling Sailingvideo

1 Month Till Splash And The Hulls Need A Lot Of Work! | Wildling Sailing

August 4, 2023 · 23 min · 153K views

What this video covers

Refitting a 42-foot Polynesian-style double canoe requires extensive hull and beam repairs one month before the scheduled launch.0:27 The project involves stripping old paint from the hulls, addressing fiberglass blisters, and repairing structural rot in the beams.12:42 Inspection of the hull blisters reveals they originated from non-stainless steel screws that rusted and caused localized delamination.16:45 Repairs include grinding out rot, applying Polypox thinned epoxy to wood surfaces, and using a clear plastic bag as a substitute for peel ply to achieve a smooth finish on beam corners.18:06 A professional painter assists with sanding the topsides and bottoms using a Festool vacuum-sander system to manage dust and improve surface preparation efficiency.10:30 The restoration process relies on iterative sanding, filling, and fiberglassing to stabilize the vessel's structure. Proper surface preparation and using thinned epoxy for deep penetration are essential for ensuring long-term integrity in wood and fiberglass repairs.18:06

Watch on YouTube

More from Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran RefitOct 2026I Lifted Her Out For a Very Important Rebuild.Sep 2026One Final Refit Before Crossing The Atlantic.Aug 20262 Days Alone at Sea On my Primitive Double-Canoe.Aug 2026

From Wildling Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue