Wildling Sailingvídeo
1 Month Till Splash And The Hulls Need A Lot Of Work! | Wildling Sailing
4 de agosto de 2023 · 23 min · 153K visitas
Qué cubre este vídeo
Refitting a 42-foot Polynesian-style double canoe requires extensive hull and beam repairs one month before the scheduled launch.0:27 The project involves stripping old paint from the hulls, addressing fiberglass blisters, and repairing structural rot in the beams.12:42 Inspection of the hull blisters reveals they originated from non-stainless steel screws that rusted and caused localized delamination.16:45 Repairs include grinding out rot, applying Polypox thinned epoxy to wood surfaces, and using a clear plastic bag as a substitute for peel ply to achieve a smooth finish on beam corners.18:06 A professional painter assists with sanding the topsides and bottoms using a Festool vacuum-sander system to manage dust and improve surface preparation efficiency.10:30 The restoration process relies on iterative sanding, filling, and fiberglassing to stabilize the vessel's structure. Proper surface preparation and using thinned epoxy for deep penetration are essential for ensuring long-term integrity in wood and fiberglass repairs.18:06
Más de Wildling Sailing
De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



