Sailing Squibvideo

Squib's Refit - Wall shelf - new toilet - conceal electrics /122

June 5, 2025 · 19 min · 719 views

What this video covers

Peter refits the interior of the catamaran Squib, focusing on installing a new toilet, mounting an electrical cabinet door, and building a custom shelf for amateur radio equipment. To accommodate a larger Jasco manual toilet, he cuts a new opening in the existing fiberglass pedestal and constructs a plywood box extension, which he plans to seal with fiberglass and epoxy.5:48 He modifies the mounting position to improve access to the toilet's base bolts, replacing a cramped, difficult-to-reach original configuration.8:18

In the aft cabin, Peter installs a door to conceal the electrical distribution panel, sizing it to allow for a fold-down desk surface.11:09 He measures the space for an amateur radio and a Pactor modem, opting to mount them on a hinged panel for easier maintenance access.13:46 He also installs a storage shelf in the starboard hull, securing it with screws and epoxy to bridge gaps against the hull's curved surface.17:05 Peter plans to finish these components off-site before final installation.14:56

Watch on YouTube

More from Sailing Squib

Sailing Squib - May 2026/3Sep 2026Sailing Squib May 2026 /2Aug 2026Sailing Squib - Contemporary WitnessJul 2026Sailing Squib - May 2026 /1Jul 2026

From Sailing Squib — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue