ΔΕΝ ΕΜΠΙΣΤΕΥΟΤΑΝ ΤΗ ΔΟΥΛΕΙΑ ΜΟΥ…

13 Ιουλίου 2025 · 17 λεπτά · 113K προβολές

Τι καλύπτει αυτό το βίντεο

Construction of a cliffside cabin involves setting concrete footings and cinder block pillars on a sloped grade. The builder uses a dry-stack method for the blocks, filling the voids with poured concrete to ensure structural stability against compression. To save costs on lumber, the builder laminates three 2x6 boards to create 6x6 beams, reinforcing the assembly with nails and hurricane straps to exceed standard load requirements. Challenges include leveling footings on uneven terrain and managing a broken mixing bucket by adding dry concrete before water. After relocating materials from a previous structure located in a flood zone, the builder installs floor joists to frame the cabin base. The project requires balancing budget-conscious construction methods with the need for high-quality, symmetrical structural work to meet partner expectations.

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Good, Bad, and Ugly

SOMETHING BIG IS COMING TOGETHER!Οκτ 2026Everything Just Got a Lot HarderΟκτ 2026BIG SPLURGE IS IT WORTH IT?!Σεπ 2026Infested, Moldy Disaster to Dream Transformation Start to FinishΣεπ 2026

Από Sailing Good, Bad, and Ugly — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος