LEI NON SI FIDAVA DEL MIO LAVORO…
13 luglio 2025 · 17 min · 113K visualizzazioni
Cosa tratta questo video
Construction of a cliffside cabin involves setting concrete footings and cinder block pillars on a sloped grade. The builder uses a dry-stack method for the blocks, filling the voids with poured concrete to ensure structural stability against compression. To save costs on lumber, the builder laminates three 2x6 boards to create 6x6 beams, reinforcing the assembly with nails and hurricane straps to exceed standard load requirements. Challenges include leveling footings on uneven terrain and managing a broken mixing bucket by adding dry concrete before water. After relocating materials from a previous structure located in a flood zone, the builder installs floor joists to frame the cabin base. The project requires balancing budget-conscious construction methods with the need for high-quality, symmetrical structural work to meet partner expectations.
Altro da Sailing Good, Bad, and Ugly
Da Sailing Good, Bad, and Ugly — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



