Sailing Good, Bad, and Uglyvideo

SHE DIDN’T TRUST MY WORK…

July 13, 2025 · 17 min · 114K views

What this video covers

Construction of a cliffside cabin involves setting concrete footings and cinder block pillars on a sloped grade. The builder uses a dry-stack method for the blocks, filling the voids with poured concrete to ensure structural stability against compression. To save costs on lumber, the builder laminates three 2x6 boards to create 6x6 beams, reinforcing the assembly with nails and hurricane straps to exceed standard load requirements. Challenges include leveling footings on uneven terrain and managing a broken mixing bucket by adding dry concrete before water. After relocating materials from a previous structure located in a flood zone, the builder installs floor joists to frame the cabin base. The project requires balancing budget-conscious construction methods with the need for high-quality, symmetrical structural work to meet partner expectations.

Watch on YouTube

More from Sailing Good, Bad, and Ugly

IT’S FINALLY DONE!Sep 2026We Needed a Win and This Wasn’t ItAug 2026The End Is Finally NearAug 2026We've Been Avoiding This and We Can't AnymoreAug 2026

From Sailing Good, Bad, and Ugly — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue