ELLE NE FAISAIT PAS CONFIANCE À MON TRAVAIL…
13 juillet 2025 · 17 min · 113K vues
Ce que couvre cette vidéo
Construction of a cliffside cabin involves setting concrete footings and cinder block pillars on a sloped grade. The builder uses a dry-stack method for the blocks, filling the voids with poured concrete to ensure structural stability against compression. To save costs on lumber, the builder laminates three 2x6 boards to create 6x6 beams, reinforcing the assembly with nails and hurricane straps to exceed standard load requirements. Challenges include leveling footings on uneven terrain and managing a broken mixing bucket by adding dry concrete before water. After relocating materials from a previous structure located in a flood zone, the builder installs floor joists to frame the cabin base. The project requires balancing budget-conscious construction methods with the need for high-quality, symmetrical structural work to meet partner expectations.
Plus de vidéos de Sailing Good, Bad, and Ugly
De Sailing Good, Bad, and Ugly — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.