HUN STOLTE IKKE PÅ ARBEIDET MITT…
13. juli 2025 · 17 min · 113K visninger
Hva denne videoen dekker
Construction of a cliffside cabin involves setting concrete footings and cinder block pillars on a sloped grade. The builder uses a dry-stack method for the blocks, filling the voids with poured concrete to ensure structural stability against compression. To save costs on lumber, the builder laminates three 2x6 boards to create 6x6 beams, reinforcing the assembly with nails and hurricane straps to exceed standard load requirements. Challenges include leveling footings on uneven terrain and managing a broken mixing bucket by adding dry concrete before water. After relocating materials from a previous structure located in a flood zone, the builder installs floor joists to frame the cabin base. The project requires balancing budget-conscious construction methods with the need for high-quality, symmetrical structural work to meet partner expectations.
Mer fra Sailing Good, Bad, and Ugly
Fra Sailing Good, Bad, and Ugly – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



