Sailing Catalpaβίντεο

Installing New Skin fittings on our Sailing Boat | Boat work Episode 186 (Sailing Catalpa)

3 Μαΐου 2020 · 18 λεπτά · 16K προβολές

Τι καλύπτει αυτό το βίντεο

Replacing through-hull skin fittings and valves requires a dry fit of all components to ensure alignment before applying sealant.1:53 For the installation on the boat *Catalpa*, the crew uses Groko valves and seals the fittings with silicone.0:37 To prevent leaks, the threads on the valves are wrapped with Loctite thread-sealing tape.2:27 During the installation in the engine compartment, the crew identifies a clearance issue where a valve sits within 3mm of the heat exchange manifold.10:15 To gain a 10mm safety margin against engine vibration, the installer files down the end of the skin fitting and re-installs the assembly.10:38 The process involves one person holding the fitting steady from the outside with a spanner while the other tightens the valve from the inside.1:34 During the final tightening of a valve, a mounting stud snaps, requiring a future repair.13:11 The project concludes after successfully installing seven total through-hull fittings.16:29

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Catalpa

they weren't expecting thisΣεπ 2026one of the most remote islands on the planetΣεπ 202629 days sailing Panama to French Polynesia the whole passageΑυγ 2026what did we learn from a month at seaΑυγ 2026

Από Sailing Catalpa — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος