Sailing Catalpavídeo

Installing New Skin fittings on our Sailing Boat | Boat work Episode 186 (Sailing Catalpa)

3 de maio de 2020 · 18 min · 16K visualizações

O que este vídeo aborda

Replacing through-hull skin fittings and valves requires a dry fit of all components to ensure alignment before applying sealant.1:53 For the installation on the boat *Catalpa*, the crew uses Groko valves and seals the fittings with silicone.0:37 To prevent leaks, the threads on the valves are wrapped with Loctite thread-sealing tape.2:27 During the installation in the engine compartment, the crew identifies a clearance issue where a valve sits within 3mm of the heat exchange manifold.10:15 To gain a 10mm safety margin against engine vibration, the installer files down the end of the skin fitting and re-installs the assembly.10:38 The process involves one person holding the fitting steady from the outside with a spanner while the other tightens the valve from the inside.1:34 During the final tightening of a valve, a mounting stud snaps, requiring a future repair.13:11 The project concludes after successfully installing seven total through-hull fittings.16:29

Ver no YouTube

Mais de Sailing Catalpa

arriving to the most remote atolls on earth...the Tuamotus09/2026they weren't expecting this09/2026one of the most remote islands on the planet09/202629 days sailing Panama to French Polynesia the whole passage08/2026

De Sailing Catalpa — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema