Sailing Catalpavideo

Installing New Skin fittings on our Sailing Boat | Boat work Episode 186 (Sailing Catalpa)

3. mai 2020 · 18 min · 16K visninger

Hva denne videoen dekker

Replacing through-hull skin fittings and valves requires a dry fit of all components to ensure alignment before applying sealant.1:53 For the installation on the boat *Catalpa*, the crew uses Groko valves and seals the fittings with silicone.0:37 To prevent leaks, the threads on the valves are wrapped with Loctite thread-sealing tape.2:27 During the installation in the engine compartment, the crew identifies a clearance issue where a valve sits within 3mm of the heat exchange manifold.10:15 To gain a 10mm safety margin against engine vibration, the installer files down the end of the skin fitting and re-installs the assembly.10:38 The process involves one person holding the fitting steady from the outside with a spanner while the other tightens the valve from the inside.1:34 During the final tightening of a valve, a mounting stud snaps, requiring a future repair.13:11 The project concludes after successfully installing seven total through-hull fittings.16:29

Se på YouTube

Mer fra Sailing Catalpa

arriving to the most remote atolls on earth...the Tuamotussep. 2026they weren't expecting thissep. 2026one of the most remote islands on the planetsep. 202629 days sailing Panama to French Polynesia the whole passageaug. 2026

Fra Sailing Catalpa – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem