Installing New Skin fittings on our Sailing Boat | Boat work Episode 186 (Sailing Catalpa)

3 de maio de 2020 · 18 min · 16K visualizações

O que este vídeo aborda

Replacing through-hull skin fittings and valves requires a dry fit of all components to ensure alignment before applying sealant.1:53 For the installation on the boat *Catalpa*, the crew uses Groko valves and seals the fittings with silicone.0:37 To prevent leaks, the threads on the valves are wrapped with Loctite thread-sealing tape.2:27 During the installation in the engine compartment, the crew identifies a clearance issue where a valve sits within 3mm of the heat exchange manifold.10:15 To gain a 10mm safety margin against engine vibration, the installer files down the end of the skin fitting and re-installs the assembly.10:38 The process involves one person holding the fitting steady from the outside with a spanner while the other tightens the valve from the inside.1:34 During the final tightening of a valve, a mounting stud snaps, requiring a future repair.13:11 The project concludes after successfully installing seven total through-hull fittings.16:29

Assistir no YouTube

Mais de Sailing Catalpa

arriving to the most remote atolls on earth...the Tuamotusset. de 2026they weren't expecting thisset. de 2026one of the most remote islands on the planetset. de 202629 days sailing Panama to French Polynesia the whole passageago. de 2026

De Sailing Catalpa — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema