Sailing Catalpavidéo
Installing New Skin fittings on our Sailing Boat | Boat work Episode 186 (Sailing Catalpa)
3 mai 2020 · 18 min · 16K vues
Ce que couvre cette vidéo
Replacing through-hull skin fittings and valves requires a dry fit of all components to ensure alignment before applying sealant.1:53 For the installation on the boat *Catalpa*, the crew uses Groko valves and seals the fittings with silicone.0:37 To prevent leaks, the threads on the valves are wrapped with Loctite thread-sealing tape.2:27 During the installation in the engine compartment, the crew identifies a clearance issue where a valve sits within 3mm of the heat exchange manifold.10:15 To gain a 10mm safety margin against engine vibration, the installer files down the end of the skin fitting and re-installs the assembly.10:38 The process involves one person holding the fitting steady from the outside with a spanner while the other tightens the valve from the inside.1:34 During the final tightening of a valve, a mounting stud snaps, requiring a future repair.13:11 The project concludes after successfully installing seven total through-hull fittings.16:29
Plus de vidéos de Sailing Catalpa
De Sailing Catalpa — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



