Expedition Evansβίντεο
We OFFICIALLY Have a SAILBOAT! | Expedition Evans 38
14 Μαΐου 2021 · 26 λεπτά · 179K προβολές
Τι καλύπτει αυτό το βίντεο
Brett and Jade Evans install a new main sail and Genoa on their restored sailboat, transitioning the vessel from a motor-only project to a functional sailing rig. The pair uses Neil Pride sails designed for an in-mast roller furling system, which requires the insertion of vertical battens into the main sail.12:40 During the installation, they discover missing shackles on the mast, necessitating a trip to West Marine to complete the rigging.2:16 The process involves routing the jib sheets through deck tracks and cars, and securing the halyards to the sails.19:49 Brett also performs electrical work on the mast wiring, cleaning and sealing connections to prevent water ingress.6:34 The crew successfully hoists, furls, and unfurls both sails to verify the operation of the furling lines and outhaul tension.23:14 The project confirms that the vessel is ready for sea trials, marking a significant milestone in their long-term restoration.
Περισσότερα από το Expedition Evans
Από Expedition Evans — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



