Expedition Evansvideo

We OFFICIALLY Have a SAILBOAT! | Expedition Evans 38

14 May 2021 · 26 min · 179K views

What this video covers

Brett and Jade Evans install a new main sail and Genoa on their restored sailboat, transitioning the vessel from a motor-only project to a functional sailing rig. The pair uses Neil Pride sails designed for an in-mast roller furling system, which requires the insertion of vertical battens into the main sail.12:40 During the installation, they discover missing shackles on the mast, necessitating a trip to West Marine to complete the rigging.2:16 The process involves routing the jib sheets through deck tracks and cars, and securing the halyards to the sails.19:49 Brett also performs electrical work on the mast wiring, cleaning and sealing connections to prevent water ingress.6:34 The crew successfully hoists, furls, and unfurls both sails to verify the operation of the furling lines and outhaul tension.23:14 The project confirms that the vessel is ready for sea trials, marking a significant milestone in their long-term restoration.

Watch on YouTube

More from Expedition Evans

What It's Really Like Anchored Off a UNINHABITED Island | EE 176May 2026Why Everyone is QUITTING Sailing | EE 175May 2026We Are No Different Than Any Other Sailor (we might be WORSE) | EE 174Mar 2026HOW WE EAT? (first we have to catch it) | EE 173Mar 2026

From Expedition Evans — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue