Expedition Evansvídeo
We OFFICIALLY Have a SAILBOAT! | Expedition Evans 38
14 de mayo de 2021 · 26 min · 179K visitas
Qué cubre este vídeo
Brett and Jade Evans install a new main sail and Genoa on their restored sailboat, transitioning the vessel from a motor-only project to a functional sailing rig. The pair uses Neil Pride sails designed for an in-mast roller furling system, which requires the insertion of vertical battens into the main sail.12:40 During the installation, they discover missing shackles on the mast, necessitating a trip to West Marine to complete the rigging.2:16 The process involves routing the jib sheets through deck tracks and cars, and securing the halyards to the sails.19:49 Brett also performs electrical work on the mast wiring, cleaning and sealing connections to prevent water ingress.6:34 The crew successfully hoists, furls, and unfurls both sails to verify the operation of the furling lines and outhaul tension.23:14 The project confirms that the vessel is ready for sea trials, marking a significant milestone in their long-term restoration.
Más de Expedition Evans
De Expedition Evans — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



