Expedition Evansvidéo

We OFFICIALLY Have a SAILBOAT! | Expedition Evans 38

14 mai 2021 · 26 min · 179K vues

Ce que couvre cette vidéo

Brett and Jade Evans install a new main sail and Genoa on their restored sailboat, transitioning the vessel from a motor-only project to a functional sailing rig. The pair uses Neil Pride sails designed for an in-mast roller furling system, which requires the insertion of vertical battens into the main sail.12:40 During the installation, they discover missing shackles on the mast, necessitating a trip to West Marine to complete the rigging.2:16 The process involves routing the jib sheets through deck tracks and cars, and securing the halyards to the sails.19:49 Brett also performs electrical work on the mast wiring, cleaning and sealing connections to prevent water ingress.6:34 The crew successfully hoists, furls, and unfurls both sails to verify the operation of the furling lines and outhaul tension.23:14 The project confirms that the vessel is ready for sea trials, marking a significant milestone in their long-term restoration.

Regarder sur YouTube

Plus de vidéos de Expedition Evans

What It's Really Like Anchored Off a UNINHABITED Island | EE 176mai 2026Why Everyone is QUITTING Sailing | EE 175mai 2026We Are No Different Than Any Other Sailor (we might be WORSE) | EE 174mars 2026HOW WE EAT? (first we have to catch it) | EE 173mars 2026

De Expedition Evans — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème