Expedition Evansvídeo

We OFFICIALLY Have a SAILBOAT! | Expedition Evans 38

14 de maio de 2021 · 26 min · 179K visualizações

O que este vídeo aborda

Brett and Jade Evans install a new main sail and Genoa on their restored sailboat, transitioning the vessel from a motor-only project to a functional sailing rig. The pair uses Neil Pride sails designed for an in-mast roller furling system, which requires the insertion of vertical battens into the main sail.12:40 During the installation, they discover missing shackles on the mast, necessitating a trip to West Marine to complete the rigging.2:16 The process involves routing the jib sheets through deck tracks and cars, and securing the halyards to the sails.19:49 Brett also performs electrical work on the mast wiring, cleaning and sealing connections to prevent water ingress.6:34 The crew successfully hoists, furls, and unfurls both sails to verify the operation of the furling lines and outhaul tension.23:14 The project confirms that the vessel is ready for sea trials, marking a significant milestone in their long-term restoration.

Assistir no YouTube

Mais de Expedition Evans

What It's Really Like Anchored Off a UNINHABITED Island | EE 176mai. de 2026Why Everyone is QUITTING Sailing | EE 175mai. de 2026We Are No Different Than Any Other Sailor (we might be WORSE) | EE 174mar. de 2026HOW WE EAT? (first we have to catch it) | EE 173mar. de 2026

De Expedition Evans — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema