Epiphany Sailingβίντεο
Bris 12 ft dinghy floor board repairs
30 Απριλίου 2026 · 3 λεπτά · 78 προβολές · Georgetown, Exumas
Crew removes floor panels from dinghy on beach
Τι καλύπτει αυτό το βίντεο
A Bris 12-ft inflatable dinghy develops two concurrent problems in Georgetown, Exumas: a persistent air leak in the rear quarter tube and a longitudinal floor-panel rail that has separated from the hull, allowing the floor panels to flex independently.0:41 The crew beaches the dinghy, deflates it three-quarters of the way, and pulls all floor panels to inspect the underside.1:25 Soapy water applied to the tube interior rules out a sub-panel leak; the source is a previously applied patch that itself failed.2:00 That patch is stripped off, a new double patch is applied, and the floor panels are re-seated with the rail re-secured.2:47 The repair sequence covers deflating an inflatable to access floor panels, using soapy water to locate air leaks, and removing and replacing failed adhesive patches on PVC tube fabric. A first patch that leaks requires complete removal before a second patch can seal properly.
Σκάφη σε αυτό το βίντεο
Περισσότερα από το Epiphany Sailing
Από Epiphany Sailing — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



