Epiphany Sailingvideo
Bris 12 ft dinghy floor board repairs
30 aprile 2026 · 3 min · 78 visualizzazioni · Georgetown, Exumas
Crew removes floor panels from dinghy on beach
Cosa tratta questo video
A Bris 12-ft inflatable dinghy develops two concurrent problems in Georgetown, Exumas: a persistent air leak in the rear quarter tube and a longitudinal floor-panel rail that has separated from the hull, allowing the floor panels to flex independently.0:41 The crew beaches the dinghy, deflates it three-quarters of the way, and pulls all floor panels to inspect the underside.1:25 Soapy water applied to the tube interior rules out a sub-panel leak; the source is a previously applied patch that itself failed.2:00 That patch is stripped off, a new double patch is applied, and the floor panels are re-seated with the rail re-secured.2:47 The repair sequence covers deflating an inflatable to access floor panels, using soapy water to locate air leaks, and removing and replacing failed adhesive patches on PVC tube fabric. A first patch that leaks requires complete removal before a second patch can seal properly.
Barche in questo video
Altro da Epiphany Sailing
Da Epiphany Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



