Epiphany Sailingvideo

Bris 12 ft dinghy floor board repairs

30. april 2026 · 3 min · 86 visninger · Georgetown, Exumas

Crew removes floor panels from dinghy on beach

Hva denne videoen dekker

A Bris 12-ft inflatable dinghy develops two concurrent problems in Georgetown, Exumas: a persistent air leak in the rear quarter tube and a longitudinal floor-panel rail that has separated from the hull, allowing the floor panels to flex independently.0:41 The crew beaches the dinghy, deflates it three-quarters of the way, and pulls all floor panels to inspect the underside.1:25 Soapy water applied to the tube interior rules out a sub-panel leak; the source is a previously applied patch that itself failed.2:00 That patch is stripped off, a new double patch is applied, and the floor panels are re-seated with the rail re-secured.2:47 The repair sequence covers deflating an inflatable to access floor panels, using soapy water to locate air leaks, and removing and replacing failed adhesive patches on PVC tube fabric. A first patch that leaks requires complete removal before a second patch can seal properly.

Se på YouTube

Båter i denne videoen

C&C Yachts 39Deres båt

Mer fra Epiphany Sailing

YOWZA ITS A THUNDERSTORM SHOWER!!!sep. 2026Space X Rocket over Georgetown Exumas Bahamas 2/19/2026feb. 202650 knot Blow Georgetown Exumas saved by Backup Snubber!feb. 2026Big Blow 50 kts hits Georgetown Exumas tonight!jan. 2026

Fra Epiphany Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem