Epiphany Sailingvídeo

Bris 12 ft dinghy floor board repairs

30 de abril de 2026 · 3 min · 86 visitas · Georgetown, Exumas

Crew removes floor panels from dinghy on beach

Qué cubre este vídeo

A Bris 12-ft inflatable dinghy develops two concurrent problems in Georgetown, Exumas: a persistent air leak in the rear quarter tube and a longitudinal floor-panel rail that has separated from the hull, allowing the floor panels to flex independently.0:41 The crew beaches the dinghy, deflates it three-quarters of the way, and pulls all floor panels to inspect the underside.1:25 Soapy water applied to the tube interior rules out a sub-panel leak; the source is a previously applied patch that itself failed.2:00 That patch is stripped off, a new double patch is applied, and the floor panels are re-seated with the rail re-secured.2:47 The repair sequence covers deflating an inflatable to access floor panels, using soapy water to locate air leaks, and removing and replacing failed adhesive patches on PVC tube fabric. A first patch that leaks requires complete removal before a second patch can seal properly.

Ver en YouTube

Barcos en este vídeo

C&C Yachts 39Su barco

Más de Epiphany Sailing

YOWZA ITS A THUNDERSTORM SHOWER!!!sept 2026Space X Rocket over Georgetown Exumas Bahamas 2/19/2026feb 202650 knot Blow Georgetown Exumas saved by Backup Snubber!feb 2026Big Blow 50 kts hits Georgetown Exumas tonight!ene 2026

De Epiphany Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema