BoatworksTodayβίντεο

Fiberglassing The Armstrong Mounts And More Prep For Coosa!

26 Ιουλίου 2020 · 17 λεπτά · 48K προβολές

Τι καλύπτει αυτό το βίντεο

Preparing a boat transom for a new Coosa board core requires extensive surface leveling and structural modification. To ensure a flush fit for the two-inch thick Coosa laminate, the transom trough must be ground down to remove existing lips and previous owner modifications. Side stringer pockets require cutting and grinding to allow the core to drop into place. To prevent thickened epoxy from leaking into the Armstrong bracket’s internal flotation chamber during installation, each of the 25 mounting holes is dished out by approximately two millimeters. A single layer of fiberglass cloth is then applied over each hole using laminating polyester resin. Once cured, these patches are sealed with wax-added gel coat and the surrounding area is faired with compound to create a level bonding surface. Keeping fairing compound thickness under a quarter-inch ensures structural integrity, with deeper voids requiring additional fiberglass buildup rather than excessive filler.

Παρακολουθήστε στο YouTube

Περισσότερα από το BoatworksToday

I Was Wrong About My Boat's Victron Wiring (You Were Right!)Σεπ 2026Will This Entire Victron Electrical System Fit In My Little Boat?Αυγ 2026The Primer Mistake You're Probably Making Painting Your Boat: Film Thickness, Not Smoothness!Αυγ 2026V-Berth Electrical Layout On A Small Sailboat: It's Tight, But It Should Work!Αυγ 2026

Από BoatworksToday — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος