BoatworksTodayvideo

Fiberglassing The Armstrong Mounts And More Prep For Coosa!

26 July 2020 · 17 min · 48K views

What this video covers

Preparing a boat transom for a new Coosa board core requires extensive surface leveling and structural modification. To ensure a flush fit for the two-inch thick Coosa laminate, the transom trough must be ground down to remove existing lips and previous owner modifications. Side stringer pockets require cutting and grinding to allow the core to drop into place. To prevent thickened epoxy from leaking into the Armstrong bracket’s internal flotation chamber during installation, each of the 25 mounting holes is dished out by approximately two millimeters. A single layer of fiberglass cloth is then applied over each hole using laminating polyester resin. Once cured, these patches are sealed with wax-added gel coat and the surrounding area is faired with compound to create a level bonding surface. Keeping fairing compound thickness under a quarter-inch ensures structural integrity, with deeper voids requiring additional fiberglass buildup rather than excessive filler.

Watch on YouTube

More from BoatworksToday

I Was Wrong About My Boat's Victron Wiring (You Were Right!)Sept 2026Will This Entire Victron Electrical System Fit In My Little Boat?Aug 2026The Primer Mistake You're Probably Making Painting Your Boat: Film Thickness, Not Smoothness!Aug 2026V-Berth Electrical Layout On A Small Sailboat: It's Tight, But It Should Work!Aug 2026

From BoatworksToday — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue