Project Brupegvídeo

A Damn Tight Squeeze, Anchoring in Port Douglas - Project Brupeg Ep.423

19 de octubre de 2025 · 29 min · 22K visitas · Cairns

Qué cubre este vídeo

The 37-nautical-mile coastal passage from Cairns to Port Douglas, Australia, involves navigating a well-defined channel marked by a sandbar extending from the headland.19:02 The vessel Brupeg, a converted fishing trawler, enters the Port Douglas river system to reach an anchorage located past the Crystal Brook Marina and the Port Douglas Yacht Club.20:08 This anchorage requires a tight U-turn in narrow waters crowded with moored vessels, necessitating careful maneuvering with the boat's wing stabilizers deployed.20:48 While anchored, the crew identifies a pressurized water leak caused by a fractured filter housing in the cofferdam, which they replace with a spare unit.22:21 The crew also performs a generator oil change by draining the hot oil directly into a keel tank via a dedicated ball valve and pipe system.2:36 After securing supplies and visiting the yacht club, the vessel departs for the Low Isles.28:12

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema