Project Brupegvideo

A Damn Tight Squeeze, Anchoring in Port Douglas - Project Brupeg Ep.423

October 19, 2025 · 29 min · 22K views · Cairns

What this video covers

The 37-nautical-mile coastal passage from Cairns to Port Douglas, Australia, involves navigating a well-defined channel marked by a sandbar extending from the headland.19:02 The vessel Brupeg, a converted fishing trawler, enters the Port Douglas river system to reach an anchorage located past the Crystal Brook Marina and the Port Douglas Yacht Club.20:08 This anchorage requires a tight U-turn in narrow waters crowded with moored vessels, necessitating careful maneuvering with the boat's wing stabilizers deployed.20:48 While anchored, the crew identifies a pressurized water leak caused by a fractured filter housing in the cofferdam, which they replace with a spare unit.22:21 The crew also performs a generator oil change by draining the hot oil directly into a keel tank via a dedicated ball valve and pipe system.2:36 After securing supplies and visiting the yacht club, the vessel departs for the Low Isles.28:12

Watch on YouTube

More from Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463Oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462Sep 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461Sep 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460Sep 2026

From Project Brupeg — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue