Project Brupegvídeo
A Damn Tight Squeeze, Anchoring in Port Douglas - Project Brupeg Ep.423
19 de outubro de 2025 · 29 min · 23K visualizações · Cairns
O que este vídeo aborda
The 37-nautical-mile coastal passage from Cairns to Port Douglas, Australia, involves navigating a well-defined channel marked by a sandbar extending from the headland.19:02 The vessel Brupeg, a converted fishing trawler, enters the Port Douglas river system to reach an anchorage located past the Crystal Brook Marina and the Port Douglas Yacht Club.20:08 This anchorage requires a tight U-turn in narrow waters crowded with moored vessels, necessitating careful maneuvering with the boat's wing stabilizers deployed.20:48 While anchored, the crew identifies a pressurized water leak caused by a fractured filter housing in the cofferdam, which they replace with a spare unit.22:21 The crew also performs a generator oil change by draining the hot oil directly into a keel tank via a dedicated ball valve and pipe system.2:36 After securing supplies and visiting the yacht club, the vessel departs for the Low Isles.28:12
Mais de Project Brupeg
De Project Brupeg — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



