Project Brupegvídeo

A Damn Tight Squeeze, Anchoring in Port Douglas - Project Brupeg Ep.423

19 de outubro de 2025 · 29 min · 23K visualizações · Cairns

O que este vídeo aborda

The 37-nautical-mile coastal passage from Cairns to Port Douglas, Australia, involves navigating a well-defined channel marked by a sandbar extending from the headland.19:02 The vessel Brupeg, a converted fishing trawler, enters the Port Douglas river system to reach an anchorage located past the Crystal Brook Marina and the Port Douglas Yacht Club.20:08 This anchorage requires a tight U-turn in narrow waters crowded with moored vessels, necessitating careful maneuvering with the boat's wing stabilizers deployed.20:48 While anchored, the crew identifies a pressurized water leak caused by a fractured filter housing in the cofferdam, which they replace with a spare unit.22:21 The crew also performs a generator oil change by draining the hot oil directly into a keel tank via a dedicated ball valve and pipe system.2:36 After securing supplies and visiting the yacht club, the vessel departs for the Low Isles.28:12

Ver no YouTube

Mais de Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.45608/2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.45508/2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.45407/2026Good Mates & Boat Maintenance - Project Brupeg Ep.45307/2026

De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema