Sailing Umavídeo

The Most CRITICAL Part of Our Boat Refit | Step 382

8 de marzo de 2024 · 25 min · 147K visitas

Qué cubre este vídeo

To prepare for structural lamination and interior refitting, the crew of the sailboat Uma removes all deck hardware, including stanchions, genoa tracks, chain plates, and the dodger.9:12 This stripping process involves unbolting over 100 fasteners to allow for re-bedding deck joints and reinforcing the hull-deck connection from the interior.12:01 The team also cuts out existing plastic through-hull fittings to relocate them above the waterline.14:35 Before beginning the glasswork, the crew uses a three-axis laser level to ensure the hull sits level in the shipyard slings.0:26 They align the laser with the mast, rudder, and keel to establish a baseline for installing new bulkheads, stringers, and cabinetry.2:36 After the shipyard moves the boat to a permanent yard location, the crew verifies the alignment against the solar panels and the factory waterline, achieving a tolerance within 2.5 centimeters.23:19 Establishing a level foundation before glassing ensures that all interior structural components remain plumb and square.0:35

Ver en YouTube

Más de Sailing Uma

We Ditched Our Steering Wheel (And Built Something Better) | Step 496sept 2026We're Finally Setting Sail Again!sept 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationsept 2026Solar Sponsor Backed Out Before Sailing Around the World !sept 2026

De Sailing Uma — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema