Sailing Umavidéo
The Most CRITICAL Part of Our Boat Refit | Step 382
8 mars 2024 · 25 min · 147K vues
Ce que couvre cette vidéo
To prepare for structural lamination and interior refitting, the crew of the sailboat Uma removes all deck hardware, including stanchions, genoa tracks, chain plates, and the dodger.9:12 This stripping process involves unbolting over 100 fasteners to allow for re-bedding deck joints and reinforcing the hull-deck connection from the interior.12:01 The team also cuts out existing plastic through-hull fittings to relocate them above the waterline.14:35 Before beginning the glasswork, the crew uses a three-axis laser level to ensure the hull sits level in the shipyard slings.0:26 They align the laser with the mast, rudder, and keel to establish a baseline for installing new bulkheads, stringers, and cabinetry.2:36 After the shipyard moves the boat to a permanent yard location, the crew verifies the alignment against the solar panels and the factory waterline, achieving a tolerance within 2.5 centimeters.23:19 Establishing a level foundation before glassing ensures that all interior structural components remain plumb and square.0:35
Plus de vidéos de Sailing Uma
De Sailing Uma — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



