The Most CRITICAL Part of Our Boat Refit | Step 382

8 marzo 2024 · 25 min · 147K visualizzazioni

Cosa tratta questo video

To prepare for structural lamination and interior refitting, the crew of the sailboat Uma removes all deck hardware, including stanchions, genoa tracks, chain plates, and the dodger.9:12 This stripping process involves unbolting over 100 fasteners to allow for re-bedding deck joints and reinforcing the hull-deck connection from the interior.12:01 The team also cuts out existing plastic through-hull fittings to relocate them above the waterline.14:35 Before beginning the glasswork, the crew uses a three-axis laser level to ensure the hull sits level in the shipyard slings.0:26 They align the laser with the mast, rudder, and keel to establish a baseline for installing new bulkheads, stringers, and cabinetry.2:36 After the shipyard moves the boat to a permanent yard location, the crew verifies the alignment against the solar panels and the factory waterline, achieving a tolerance within 2.5 centimeters.23:19 Establishing a level foundation before glassing ensures that all interior structural components remain plumb and square.0:35

Guarda su YouTube

Altro da Sailing Uma

We Ditched Our Steering Wheel (And Built Something Better) | Step 496set 2026We're Finally Setting Sail Again!set 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationset 2026Solar Sponsor Backed Out Before Sailing Around the World !set 2026

Da Sailing Uma — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema