Project Brupegvídeo

Prep to start the new engine - Project Brupeg Ep.327

29 de octubre de 2023 · 34 min · 50K visitas

Qué cubre este vídeo

The crew of the expedition trawler Brewpeg works to finalize the main engine installation and cooling systems in preparation for upcoming sea trials. After a failed initial attempt to set the engine mounts with Chockfast resulted in the resin leaking into the bilge, the team removes the gearbox to clean the mounts and re-align the engine.1:26 They fabricate and install custom keel cooling pipes, flushing the system with fresh water to remove rust before adding certified coolant.19:08 A modified aluminum reservoir tank is mounted to the engine room ceiling using 175mm aluminum angle brackets to improve accessibility for fluid filling.26:02 Simultaneously, the electrical team integrates a Cummins Hall Effect sensor to monitor shaft RPM, successfully transmitting data via NMEA to the wheelhouse gauges.14:10 The project remains on a tight schedule to complete engine testing, water-tightness checks on the dams, and final alignment before sea trials.23:07

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema