Project Brupegvideo

Prep to start the new engine - Project Brupeg Ep.327

29. oktober 2023 · 34 min · 50K visninger

Hva denne videoen dekker

The crew of the expedition trawler Brewpeg works to finalize the main engine installation and cooling systems in preparation for upcoming sea trials. After a failed initial attempt to set the engine mounts with Chockfast resulted in the resin leaking into the bilge, the team removes the gearbox to clean the mounts and re-align the engine.1:26 They fabricate and install custom keel cooling pipes, flushing the system with fresh water to remove rust before adding certified coolant.19:08 A modified aluminum reservoir tank is mounted to the engine room ceiling using 175mm aluminum angle brackets to improve accessibility for fluid filling.26:02 Simultaneously, the electrical team integrates a Cummins Hall Effect sensor to monitor shaft RPM, successfully transmitting data via NMEA to the wheelhouse gauges.14:10 The project remains on a tight schedule to complete engine testing, water-tightness checks on the dams, and final alignment before sea trials.23:07

Se på YouTube

Mer fra Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463okt. 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sep. 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sep. 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sep. 2026

Fra Project Brupeg – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem