Project Brupegvidéo

Prep to start the new engine - Project Brupeg Ep.327

29 octobre 2023 · 34 min · 50K vues

Ce que couvre cette vidéo

The crew of the expedition trawler Brewpeg works to finalize the main engine installation and cooling systems in preparation for upcoming sea trials. After a failed initial attempt to set the engine mounts with Chockfast resulted in the resin leaking into the bilge, the team removes the gearbox to clean the mounts and re-align the engine.1:26 They fabricate and install custom keel cooling pipes, flushing the system with fresh water to remove rust before adding certified coolant.19:08 A modified aluminum reservoir tank is mounted to the engine room ceiling using 175mm aluminum angle brackets to improve accessibility for fluid filling.26:02 Simultaneously, the electrical team integrates a Cummins Hall Effect sensor to monitor shaft RPM, successfully transmitting data via NMEA to the wheelhouse gauges.14:10 The project remains on a tight schedule to complete engine testing, water-tightness checks on the dams, and final alignment before sea trials.23:07

Regarder sur YouTube

Plus de vidéos de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct. 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept. 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept. 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept. 2026

De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème