Project Brupegvídeo
Prep to start the new engine - Project Brupeg Ep.327
29 de outubro de 2023 · 34 min · 50K visualizações
O que este vídeo aborda
The crew of the expedition trawler Brewpeg works to finalize the main engine installation and cooling systems in preparation for upcoming sea trials. After a failed initial attempt to set the engine mounts with Chockfast resulted in the resin leaking into the bilge, the team removes the gearbox to clean the mounts and re-align the engine.1:26 They fabricate and install custom keel cooling pipes, flushing the system with fresh water to remove rust before adding certified coolant.19:08 A modified aluminum reservoir tank is mounted to the engine room ceiling using 175mm aluminum angle brackets to improve accessibility for fluid filling.26:02 Simultaneously, the electrical team integrates a Cummins Hall Effect sensor to monitor shaft RPM, successfully transmitting data via NMEA to the wheelhouse gauges.14:10 The project remains on a tight schedule to complete engine testing, water-tightness checks on the dams, and final alignment before sea trials.23:07
Mais de Project Brupeg
De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



