Entre Terras e Maresvídeo
Another finishing stage in the aft cabin and galley! S1 ep 154
16 de febrero de 2025 · 26 min · 370 visitas
Qué cubre este vídeo
Edgar and Sâmia continue the interior finishing work on their boat, focusing on the aft cabin and galley cabinetry. The crew spent the week applying edge banding to furniture panels, including the bed frame and various storage lockers.1:26 The aft cabin features a queen-sized berth measuring 1.54m by 1.98m, with integrated storage drawers and shoe racks beneath the bed.5:57 The bathroom cabinetry is largely complete, with the team installing hangers for wet weather gear and finalizing the layout for a diesel hose run.7:31 Future tasks include installing the marine head, completing the electrical wiring, and finishing the ceiling and mirror mounts.2:18 Edgar is also collaborating with his brother on a deck-layout study to route halyards and sail controls to the cabin top, aiming to simplify mast-base operations.10:14 The project remains on track for a 2025 launch, pending favorable weather for exterior woodworking.10:53
Más de Entre Terras e Mares
De Entre Terras e Mares — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



