Entre Terras e Maresvideo

Another finishing stage in the aft cabin and galley! S1 ep 154

February 16, 2025 · 26 min · 370 views

What this video covers

Edgar and Sâmia continue the interior finishing work on their boat, focusing on the aft cabin and galley cabinetry. The crew spent the week applying edge banding to furniture panels, including the bed frame and various storage lockers.1:26 The aft cabin features a queen-sized berth measuring 1.54m by 1.98m, with integrated storage drawers and shoe racks beneath the bed.5:57 The bathroom cabinetry is largely complete, with the team installing hangers for wet weather gear and finalizing the layout for a diesel hose run.7:31 Future tasks include installing the marine head, completing the electrical wiring, and finishing the ceiling and mirror mounts.2:18 Edgar is also collaborating with his brother on a deck-layout study to route halyards and sail controls to the cabin top, aiming to simplify mast-base operations.10:14 The project remains on track for a 2025 launch, pending favorable weather for exterior woodworking.10:53

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue