Entre Terras e Maresvideo

Another finishing stage in the aft cabin and galley! S1 ep 154

16 de febrero de 2025 · 26 min · 370 vistas

¿Qué cubre este video?

Edgar and Sâmia continue the interior finishing work on their boat, focusing on the aft cabin and galley cabinetry. The crew spent the week applying edge banding to furniture panels, including the bed frame and various storage lockers.1:26 The aft cabin features a queen-sized berth measuring 1.54m by 1.98m, with integrated storage drawers and shoe racks beneath the bed.5:57 The bathroom cabinetry is largely complete, with the team installing hangers for wet weather gear and finalizing the layout for a diesel hose run.7:31 Future tasks include installing the marine head, completing the electrical wiring, and finishing the ceiling and mirror mounts.2:18 Edgar is also collaborating with his brother on a deck-layout study to route halyards and sail controls to the cabin top, aiming to simplify mast-base operations.10:14 The project remains on track for a 2025 launch, pending favorable weather for exterior woodworking.10:53

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026

De Entre Terras e Mares — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema