Entre Terras e Maresvídeo

Another finishing stage in the aft cabin and galley! S1 ep 154

16 de fevereiro de 2025 · 26 min · 370 visualizações

O que este vídeo aborda

Edgar and Sâmia continue the interior finishing work on their boat, focusing on the aft cabin and galley cabinetry. The crew spent the week applying edge banding to furniture panels, including the bed frame and various storage lockers.1:26 The aft cabin features a queen-sized berth measuring 1.54m by 1.98m, with integrated storage drawers and shoe racks beneath the bed.5:57 The bathroom cabinetry is largely complete, with the team installing hangers for wet weather gear and finalizing the layout for a diesel hose run.7:31 Future tasks include installing the marine head, completing the electrical wiring, and finishing the ceiling and mirror mounts.2:18 Edgar is also collaborating with his brother on a deck-layout study to route halyards and sail controls to the cabin top, aiming to simplify mast-base operations.10:14 The project remains on track for a 2025 launch, pending favorable weather for exterior woodworking.10:53

Assistir no YouTube

Mais de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul. de 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun. de 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun. de 2026This week the focus was on something elsejun. de 2026

De Entre Terras e Mares — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema